Results (
English) 1:
[Copy]Copied!
For wood, it should surface as a primer for wood flooring.When the process is complete, the paint, then it reaches the stage of the painting painted by slash slash should re-apply, leave 2-3 storey painted by period waiting for the floor to dry before the day before and then the next layer down, lapping the lash.Just make it simple to paint with long future.
Being translated, please wait..
