Results (
English) 1:
[Copy]Copied!
Considering that this procedure can be executed in a based on the type of harm which must reduce the risk found the risk found by accepting that there is a limit based on the "criteria for the acceptance of the risk."1. development or changes to the product.2. instructions of use or labelling3. to change the packaging.
Being translated, please wait..
