Results (
English) 1:
[Copy]Copied!
PRECAST CONCRETE CONSTRUCTION step by step• Problem statement (motivation)Time limit on use of Tower Crane just 3 hours a day (5.00 am 7.00 am.-). Easily transported from the factory must be on time with the Tower Crane (lifting from the back up car hanging above buildings) Tall building in relocation.There are restrictions in the field of transport is on average 10 sheets per day (1 layer, use 100 sheets total 25 floors)• Objective of studyO to be aware of the requirement to use the Tower Crane. In Precast wall panelsO to know the behavior of workers in Precast wall panels.O to know the important factors that affect the Precast wall panels.O to suggest guidelines on management of machinery and people, with Precast wall installation time, as much as possible.• Scope of studyO this study focuses on the study of the machine management and administrative workers to install the Precast slabs was completed in accordance with the scheme set out under the Tower Crane. With limited time usage.O a study of Precast wall panels only Aspire condo 2 storey building size 25 Rattanathibet.• Work processes1. Precast slabs come in a truck in front of the side by the vertical arrangement prepared for Tower Crane lifting up with the Plate that is filed out of the building every installed wall piece by all transport trucks.2. use the hoist 2 In the Precast wall panels On the building and scenes set in each installation (if it is a problem how to cross first. Waiting for the technician to come and basically bite scenes as you want. O in case of low or location out of plate head rope.1. check position.2. punch on the ground, อ้ and matham.3. If you're shooting drill plug steel (Epoxy) 4. shake yotwan ดว้ stud waiting for 20 minutes.5. any hindrance to tightly.3. installation of Pre-cast walls to check line Walls of buildings along the long edge and vertical, in order to align the structure with no sheet.4. install the steel Support H-Beam to meet the low places with Pre-cast slabs that Pate could have tended to.5. installation of steel beams under the Pate on the horizontal.6. use a pulley to raise up Pre-cast panels installed to guide and provide links to plummet on pre-cast slabs with the pate plate caution to lift Pre-cast slabs, installation should be installed at least 2 Truss configuration line in the direction perpendicular to the vertical wall.7. reinforced cast iron line or8. the process of welding seam welding discs consist of external walls.9. pour a special concrete Use waterproof materials effective absorption10. not decorations, suitable for smooth skin.Draw a floor plan of Simulation
Being translated, please wait..
