Results (
English) 3:
[Copy]Copied!
From figure 4.1.1.1.1.1, the main problem is that we are used by an electric pallet truck by every employee, for many reasons. First of all, preloading. There is not enough capacity at the local level to support a large number of projects waiting to be exported, as this may be the reason. Pareto has a length that extends from a designated point, which is the second reason to block the employee's land. At that time, due to a large number of goods, one third of the reasons<br>
Being translated, please wait..
