Results (
English) 1:
[Copy]Copied!
25/09/2015, ordered from TPC, sending the VCM from TPC to 300 ton Tank number O-FA811C. So, I go out to Field operator Line VCM to transmit and to submit at 21.52 hrs.And see whether there is an increase in the O-FA811B Tank occurred at 23.10 p.m. has to stop temporarily to check for the cause by no. 9 of the Vale has found a Tank O-FA811B does not close completely the Valve which is opened slightly, and.It has made the passing into the amount of VCM 83 ton and get notified via TPC acknowledges at 23.15 pm hold preliminary and then with VCM and then sending another ton TPC 217 is based on the number of incoming Tank O-FA811B and via TPC told us that.You have to send a complete 300 ton, and has asked for an additional 100 ton when checking and make corrections at no.9 and every Valve, it is notified that the TPC at 23.30 pm are sent the VCM to the TPC as a number.Continue until At issue is this happening has to reiterate to the Fill operator, as a guide, the next time that if there is a different Move, check out all the relevant Valve before sending.Sanam
Being translated, please wait..
