Results (
English) 3:
[Copy]Copied!
For the reason of this theatre. Start from the local government of New South Wales. Want to build a theatre to replace โรงละครซิดนีย์ town hall, that is too small, can be utilized as it should be.
.
.You okay, Utzon was the winner of the competition is to design ซิดนีย์โอเปราเฮาส์ architects. In 2500 by this project started construction in 2501 and finished in 2516 with a total budget of 102 million dollars U.S.. Or the story 3 billion.2500. In 7 million US dollars, or about 210 million, of which more than the estimate to 14 as it
.
.
Being translated, please wait..
