Results (
English) 1:
[Copy]Copied!
A condom that does not pass the inspection hole leakage at the point before the Pack ฟอล์ย (Pre Qualification Foiling) condom will be rolling out, and then check with electronic machines again and will check again according to SOP-15 will be accepted, or not, depending on the audit results.
Being translated, please wait..
