Results (
English) 2:
[Copy]Copied!
Any risks Remaining after the control measurement. Must be evaluated according to criteria defined by the risk management plan. Results of the evaluation will be documented in the report, risk analysis if the residual risk is not a condition. Control and measurement of risk needs to be updated in line.
Being translated, please wait..
