Results (
English) 1:
[Copy]Copied!
To evaluate the level of risk that could cause havoc in the production process, based on severity and frequency levels that have occurred and to determine the level of risk to the risk analysis, and then save the result in a RM-02: risk analysis and assessment (Risk Analysis and Evaluation)
Being translated, please wait..