Results (
English) 3:
[Copy]Copied!
The options 2 solution by changing the record time stamp function
, which in this case could be a problem in terms of cost. Because of working overtime
.As a result, the cost of the project increased, there is a way to solve this problem 2 options, which are shown in table 3.2.
Being translated, please wait..
