Results (
English) 1:
[Copy]Copied!
According to the guidelines, the analysis conducted by the quality assurance Manager, or who have been assigned according to the method described in 6.1.1.1 topics may be edited and prevention practices project (Corrective Action and Preventive Action – CAPA) team responsible for operating projects, edit and protect (CAPA) will depend on the purpose of the project managers, quality assurance or those who.Assigned to be responsible for liaison with the team.
Being translated, please wait..