Results (
English) 2:
[Copy]Copied!
The consultant will study the consistency of the project partners throughout the country and
the new line could resume construction in the near future. The review of the preliminary Construction of the project found that the couple has developed to the center of Bangkok. Since it is a junction point and is critical for long-distance intercity passenger trains. And a freight train coming from all directions. The development will be divided into intervals. The period of implementation of the Master Plan, all 17 routes, as shown in Figure 2.1 to 2 can be divided into three periods shown in Table 2.1 to 2.
Being translated, please wait..
