Results (
English) 1:
[Copy]Copied!
Condominium juristic IDEO The hotel Sukhumvit 8. coordination of contractors to perform check electrical system inside the building by 2558 (2015) annual schedule to continue on Wednesday, May 20, 2015 time 09.00 – 12.00 pm. This is to prevent emerging obstacles to such work. Management chatkan test is performed.Operation of electrical system inside the building to prepare for the actual operation by an electric fire to a building inside the building for about ½ hour on Thursday, May 14, 2015 from 14.00 – 14.30 p.m. that power sets in and the central corridor is not available, but the elevator will run normally.
Being translated, please wait..
