Results (
English) 1:
[Copy]Copied!
If the Inspection Lot Lot 1 in every 10.. found that the product does not meet the physical requirements, it will be cancelled.
Do not analyze the quality in granulation phase must analyze the new Inspection Lot number end.
produced no less than 10
Lot.
Being translated, please wait..