Results (
English) 1:
[Copy]Copied!
TRL is an indication of the level of technology readiness and stability, based on the context of use as raw material. Key elements and system-wide work processes before integrating the technology into the system. With details as follows: TRL 1: basic principles to be considered and reported (Basic principles observed and reported). TRL 2: generating ideas, technology and/or applications (application and/or Technology concept formulated).TRL 3: experiments and analysis of the primary and/or proof of concept (Analytical and experimental critical function and/or characteristic proof-of concept).TRL 4: test elements and/or electronic simulation experiments (breadboard) Board in a laboratory environment (Component and/or breadboard validation in laboratory environment). TRL 5: test elements and/or electronic simulation experiments (breadboard) Board in the relevant environment (Component and/or breadboard validation in relevant environment).TRL 6: testing the system or subsystem model or prototype in the relevant environment, either terrestrial or space (System/subsystem model or prototype demonstration in a relevant environment (ground or space))TRL 7: testing a prototype system in space environment (System prototype demonstration in a space environment).TRL 8: actual system completed and qualified through test and demonstration on the ground or in space (Actual system completed and "flight qualified" through test and demonstration (or ground space)) TRL 9: actual system proven successful by the Mission aviation (Actual system "proven flight" through successful mission operations).Present the TRL of TRL project at the project start date.TRL expected the project to TRL level. When the project ends.
Being translated, please wait..
