After the construction of water storage, for example, has 4 points 1 point 2 points, starting at the entrance of water storage ponds 1, 3 points to 4 points with artificial lake, and water from the artificial lake.
After construction Water samples were collected 4 points, 1 start collecting water, the 2-in wells 1, point 3 inlet, wetlands, water points, four out of the wetland.
After construction, collect water samples 4 point 1 started to collect water, points 2 entrance 1 pond, water 3 point to point out, water 4 wetland wetland