Results (
English) 3:
[Copy]Copied!
1. Clean in the system of packing machine every time after the end of daily production (Final CIP).2. Clean weekly, which, when to stop production 1 days.3. Use clean when a deviation to infection (Intermedia CIP), such as a power outage,The pipe is leaking at the Product packing machine, Product tank, over flow ลมตก.
Being translated, please wait..
